FLOWCELL™ Mine Backfill Saves Landfill

Flowcell™ foam transported 115,000 tons of material needed to backfill a mine.

An operating landfill was subject to closing due to the potential subsidence of an abandoned underground mine lying beneath it. The patented Flowcell™ low moisture foam transport process was used to transport 115,000 tons of minus 3/8-inch crushed limestone waste material into the mine through strategically placed boreholes.

The 115,000 tons of backfill material was transported and placed using less than 13% water. The fill material traveled via the foam transport method into the otherwise inaccessible mine up to distances of 500 feet from the injection boreholes. Essentially 100% of the 13-foot high mine rooms were filled utilizing the highly economical, pumpable foamed transport process, with filling to continue as the landfill continues to expand.

For General Information Contact:

Gary J. Colaizzi
Goodson & Associates, Inc.
12200 West 50th Place, Unit A
Wheat Ridge, CO 80033 USA
(303) 233-2244
info@goodsonassociates.com